Shelter Registration
To establish a Shelter in Juvantia, you must complete the registration process.
Registration Portal
All Shelter registrations are handled through the official portal:
juvantia.org/shelter_registration
Electricity Connection
If your Shelter requires an electrical connection (e.g., for lighting, equipment, or Robulus charging), you must submit a separate application.
- Where: Aediles (formerly Consul Office).
- Requirement: You must have a valid Shelter registration before applying for electricity.
Design Code
In certain districts of Juvantia, the exterior appearance of your Shelter must comply with the local Design Code.
- Check District Rules: Before construction or installation, verify if your location has specific aesthetic requirements.
- Compliance: Failure to adhere to the design code may result in fines or a demolition order.